Process, 4 February 2026, 4 min read

What happens before construction starts

Site checks, drawings and approvals: the unglamorous work that decides how smoothly the build goes.

3D design of a white two-storey house at dusk

The first weeks of a project can feel slow because nothing is visibly being built. In reality, this is when the largest risks are removed.

Understanding the site

A site assessment looks at soil, levels, access, drainage, neighbouring structures and local regulations. These findings shape the foundation design, the schedule and the budget.

Drawings that can be built

Architectural drawings show what the building looks like. Structural and services drawings show how it works. They need to agree with each other before work starts, otherwise the conflicts get solved on site, at your expense.

Approvals and permissions

Depending on where you build, you may need sanctioned plans, utility approvals and other permissions. Tracking them early avoids the stop-start progress that frustrates owners.

  • Confirm ownership documents and boundaries
  • Complete a soil investigation where the structure needs it
  • Finalise drawings, specifications and the estimate
  • Agree the schedule and the site access arrangements